Please complete the form fully with the best available information to ensure a detailed review of the energy-savings opportunity of the measure and to support any subsequent determination of an appropriate prescriptive incentive amount should the measure be accepted to be added to the program. Please submit completed forms to retrofit@ieso.ca.
Completed forms that were submitted by February 28, 2025, will be reviewed and considered for inclusion in the program update planned for Fall 2025. Forms submitted after that date will be considered for a future program update.
Please refer to the chart below for submission dates and the corresponding Retrofit program update.
Forms received by |
Program update consideration |
---|---|
February 28, 2026 |
Fall 2026 |
July 31, 2025 |
Spring 2026 |
February 28, 2025 |
Fall 2025 |
The evaluation of the submissions involves an in-depth, multi-stage review and approval process to ensure a measure addresses market needs and meets program requirements, including cost-effectiveness, and energy-efficiency policy objectives. As this process is highly detailed, the review can take several months to complete.
The IESO will be posting information on this webpage the first week of each month to provide updates on the status of the evaluation for measures that have been submitted for consideration.
The IESO would like to thank you for your submissions. Each measure submitted for consideration to the Save on Energy Retrofit program is reviewed and screened for possible inclusion in the program. Measures are reviewed for expected energy savings and peak demand reduction, availability, market demand and suitability as a prescriptive measure.
The decisions indicated on the measures below are considered final and will not be reconsidered for the program unless new or updated information is provided.
Please note: the charts below include measures that were previously submitted for consideration. Measures submitted after these dates will be included on this page once all screenings are complete. This page will be updated the first week of each month.
* Reminder: general lighting measures, including lighting measures that were previously submitted and accepted in the charts below, are no longer offered under the Retrofit program. Businesses can receive instant discounts on the purchase of qualified energy-efficiency lighting upgrades from participating distributors of the Instant Discounts program.
Measure Submitted | Status | Rationale |
---|---|---|
Rooftop unit demand controller |
Not accepted as a new measure |
Not suitable as a prescriptive measure; insufficient evidence of competitive market for proposed technology |
Master controller compressed air system |
Not accepted as a new measure |
Not suitable for prescriptive measure due to high variability of potential energy savings |
Carbon monoxide sensor for parking garages - new tiers |
Accepted |
Included in Sept. 2021 Retrofit program update |
Creep heat controller |
Accepted |
Included in Sept. 2021 Retrofit program update |
Floating head for computer room air conditioning units |
Not accepted as a new measure |
Produces energy savings but does not contribute to program objective to achieve summer peak demand savings |
Fixed speed air compressors (load/unload) |
Not accepted as a new measure |
Incentives already exist for variable frequency drive and variable displacement air compressors, which are more efficient in most cases |
Exterior lighting |
Not accepted as a new measure |
Does not contribute to program objective to achieve summer peak demand savings |
Shade curtain for greenhouses |
Not accepted as a new measure |
Required through bylaws in some Ontario jurisdictions; would contribute to free ridership |
High lumen high-bay luminaire |
Accepted |
Included in Sept. 2021 Retrofit program update |
Warehouse high-bay lighting |
Accepted |
Included in Sept. 2021 Retrofit program update |
Explosion-proof 150W LED fixtures |
Already eligible |
Already available in the Retrofit program under the prescriptive high bay and prescriptive low bay fixture categories; see lighting worksheet |
Condo high-rise window replacement |
Not accepted as a new measure |
Not suitable as a prescriptive measure due to high variability of potential energy savings |
Energy sub-metering equipment |
Not accepted as a new measure |
Not suitable for a prescriptive equipment replacement program as it does not produce electricity savings on its own |
Booster pump |
Accepted |
Included in April 2022 Retrofit program update |
Electronic commutated direct current motor fans |
Already eligible |
Retrofit program prescriptive measures are already available for fan motor replacement and fan-powered variable air volume box; see services and hospitality worksheet |
Cold water ice rink resurfacing |
Not accepted as a new measure |
Not suitable as a prescriptive measure due to high variability of potential energy savings |
Electrically driven positive displacement dosing pumps |
Not accepted as a new measure |
Volume of measure use not expected to be sufficient to include in program |
Vacuum pump |
Not accepted as a new measure |
Not suitable as a prescriptive measure; insufficient competitive market for proposed technology |
Hydronic heating additive |
Not accepted as a new measure |
Does not contribute to program objective to achieve summer peak demand savings |
Measure Submitted | Status | Rationale |
---|---|---|
8' LED retrofit kit |
Accepted |
Included in April 2022 Retrofit program update |
Design envelope booster package with integrated drive and control logic |
Accepted |
Included in April 2022 Retrofit program update |
VFD for hydronic system |
Already eligible |
Retrofit program prescriptive measure is already available for variable frequency drive; see VFD worksheet |
Heating management system |
Not accepted as a new measure |
Not suitable as a prescriptive measure due to high variability of potential energy savings; also does not contribute to program objective to achieve summer peak demand savings |
Heated chair (to replace outdoor patio heaters) |
Not accepted as a new measure |
Does not contribute to program objective to achieve summer peak demand savings; insufficient evidence of competitive market for proposed technology |
Building booster pump package with VFD |
Accepted |
Included in April 2022 Retrofit program update |
Window films |
Not accepted as a new measure |
Not suitable as a prescriptive measure due to high variability of potential energy savings |
Pane glass windows with or without tint |
Not accepted as a new measure |
Suggested measure is equivalent to Ontario Building Code requirements; considered as baseline for new build or major retrofits |
Smart thermostats in multi-unit residential buildings |
Not accepted as a new measure |
Not suitable as a prescriptive measure due to uncertainty of energy savings |
Chiller water temperature reset |
Not accepted as a new measure |
Not suitable as a prescriptive measure due to high variability of savings based on strategy/product implemented; measure also unlikely to support objective of summer peak demand savings |
Cloud-based RTU controls |
May qualify under the custom stream, subject to M&V requirements |
|
High bay LED lights in freezers |
Already eligible |
Already available in the Retrofit program under the prescriptive high bay fixture category |
Power conditioner |
Not accepted as a new measure |
Does not contribute to program objective to achieve summer peak demand savings |
Measure Submitted | Status | Rationale |
---|---|---|
Pump control |
Accepted |
Included in April 2022 Retrofit program update (as Circulator Pumps with Electronically Commutated Motors, and Variable Speed Domestic Cold Water Booster Pump System) |
Indoor air quality control |
May qualify under the custom stream, subject to M&V requirements |
|
ECM motor in refrigerated display case |
Accepted |
Included in April 2022 Retrofit program update, as well as the new Small Business Program |
Refrigerated display cabinet door |
Accepted |
Included in October 2022 Retrofit program update |
Low-pressure, low-global warming potential (GWP) refrigeration system |
Not accepted as a new measure |
Not suitable as a prescriptive measure due to uncertainty of energy savings |
Maintenance for business refrigeration installed equipment, cleaning coil and gasket replacement |
Not accepted as a new measure |
Retrofit program is focused on energy-efficient equipment replacement; operations and maintenance are outside of the scope of the program |
Display case door film |
Not accepted as a new measure |
Not suitable as a prescriptive measure due to the variability of savings |
Exterior LED lit sign |
Not accepted as a new measure |
May already be eligible under LED tube replacements |
Digital demand control or variable frequency drive control on compressor |
Accepted |
Included in October 2022 Retrofit program update |
Window and roof replacement |
Not accepted as a new measure |
Not suitable as a prescriptive measure due to high variability of potential energy savings |
Vehicle charging station |
Not accepted as a new measure |
Not suitable as a prescriptive electricity-saving measure |
Dust collection valve |
Not accepted as a new measure |
Not suitable as a prescriptive measure due to high variability of potential energy savings |
ECMs for fans and circulator pumps |
Accepted |
Included in April 2022 Retrofit program update |
High bay lighting over 50,000 lumens |
For future consideration Update: Not accepted as a new measure |
Higher output categories were added to the LED Medium & High Bay measures in the Sept. 2021 program update. The IESO will monitor the impact of the new categories before considering additional categories. Update: As of Dec 18, 2023, incentives for general lighting measures are no longer offered under the Retrofit program. |
Measure Submitted | Status | Rationale |
---|---|---|
Air handling unit and roof-top unit building automation system controls |
May qualify under the custom stream, subject to M&V requirements |
|
2x2 30W LED Panel Lights |
Already eligible |
Already available in the Retrofit program |
Chiller and boiler integrated circulator pumps |
May qualify under the custom stream, subject to M&V requirements |
|
Voltage optimization |
Not accepted as a new measure |
Not suitable as a prescriptive measure due to the high variability of potential energy savings |
Fine bubble diffusers for the aeration tanks in wastewater treatment plants |
May qualify under the custom stream, subject to M&V requirements |
|
Measure Submitted | Status | Rationale |
---|---|---|
Air diffuser for waste water treatment |
May qualify under the custom stream, subject to M&V requirement |
|
Single-stage, direct-drive, high-speed turbo blowers with air or magnetic bearings |
May qualify under the custom stream, subject to M&V requirement |
|
Artificial intelligence for building automation systems |
Not accepted as a new measure |
Not suitable as a prescriptive measure due to the high variability of potential energy savings |
Two-way energy valve with built-in intelligence (two-way communication) for pump controls |
May qualify under the custom stream, subject to M&V requirements |
|
ENERGY STAR® water source heat pump |
May qualify under the custom stream, subject to M&V requirement |
|
Super premium motor opportunities exceeding the currently available 200 HP threshold |
Accepted |
Included in October 2022 Retrofit program update |
Variable frequency drives for super premium motor opportunities exceeding the currently available 200 HP threshold |
Accepted |
Included in October 2022 Retrofit program update |
Air-to-water heat pump (also referred to as a reversible chiller) |
May qualify under the custom stream, subject to M&V requirements |
|
Airport runway LED |
Not accepted as a new measure |
Specialized product that is not covered under DLC or ENERGY STAR® |
PV connected directly to LED without inverter |
May qualify under the custom stream, subject to M&V requirements |
|
Low emissivity ceiling membrane for ice rinks |
May qualify under the custom stream, subject to M&V requirements |
|
Air compressor with built-in inlet modulation control |
May qualify under the custom stream, subject to M&V requirements |
|
Measure Submitted | Status | Rationale |
---|---|---|
Exterior lighting |
Not accepted as a new measure |
Exterior lighting measures are no longer eligible for incentives in the Retrofit program due to low peak demand savings |
High-volume, low-speed fan for air destratification |
May qualify under the custom stream, subject to M&V requirements |
|
Smart cooling technology |
May qualify under the custom stream, subject to M&V requirements |
|