XLerate Program

Get started

Save energy at scale - up to $15 million in project funding

The Save on Energy XLerate Program is a streamlined, pay-for-performance initiative that provides organizations across Ontario in the industrial, municipal, institutional, and healthcare sectors with a simplified approach to undertaking large-scale energy-efficiency projects. This program is supported by the Ontario government.

SOE no tag logo
Ontario government logo

Key program features

 
profitable icon - a graph with trending upward with a dollar sign

Designed for large-scale, complex energy-efficiency projects across Ontario’s industrial, municipal, institutional and healthcare sectors.

energy down icon

Lower thresholds for projects that will deliver a minimum 600 MWh of electricity savings.

money bag icon to reduce cost

Project feasibility study (PFS) funding at a 50% cost share helps organizations assess opportunities and reduce upfront risk.

profitable icon - a graph with trending upward with a dollar sign

Project incentives of $300/MWh up to 75% of eligible project costs, with a maximum of $15 million per project.

expert support icon - three people grouped together

Comprehensive support services guide participants from initial scoping through to implementation and measurement and verification (M&V).

How does the program work?

 

Eligible participants have the option to take one of two project paths:

 
XLerate process flow chart

Who is eligible?

 

Participants must be located in Ontario and must be:

  • Owners and/or operators of a non-residential facility, or
  • Third-party applicants with the authority to implement a project at a non-residential facility

Projects must:

  • Involve an energy-efficiency improvement applied to, or in support of, an industrial process.
  • Propose a minimum electricity savings of 600 MWh per year.
  • Use technology that is commercially available and not excluded by the program eligibility rules.
  • Be completed within five years of the execution date of the Participant Agreement.

Success stories

 

coin in hand icon

A food and beverage processing facility’s refrigeration system used fixed-speed ammonia compressors. They frequently operated at low loads, resulting in inefficient unloading and cycling.

Project scope

Retrofit an existing compressor with an inverter-duty motor and VFD, supported by upgraded controls and optimized sequencing to better match refrigeration demand.

 

XLerate incentive

$211,000

Electricity cost savings

$70,000/year

 

coin in hand icon

A product manufacturing facility used energy- and water-intensive liquid-ring vacuum pumps to support a continuous production process.

Project scope

Replace three liquid-ring vacuum pumps with a variable-speed turbo blower, while retaining one smaller pump for a separate vacuum service.

 

XLerate incentive

$451,000

Electricity cost savings

$150,000/year

 

coin in hand icon

A mining operation relies on four screw compressors to meet continuous surface and underground compressed-air demand, with three units typically operating at once.

Project scope

Replace the existing compressor fleet with two fixed-speed and two variable-speed compressors, supported by a new control system to efficiently match output with compressed-air demand.

 

XLerate incentive

$390,000

Electricity cost savings

$130,000/year

Frequently asked questions

General XLerate program overview

Measurement and Verification (M&V)

Funding and Incentives

Ready to get started?

 

Submit your contact information here and a program representative will contact you.

Webinar

XLerate Program for Large Energy Efficiency Projects

January 28, 2026

Presentation deck

Existing participants of the Industrial Energy Efficiency Program (IEEP) can access the program portal here.

Having trouble? See our IEEP portal registration guide.